Projects

    Chadron Aquatic and Wellness Center

    placeholder-1140x400

    The Rundown

    Residents of Chadron, Nebraska, enjoyed using an outdoor pool during the summer months. When an indoor pool at Chadron State College needed replacement, the college and the city joined forces to build a modern indoor pool that would be open to all.

    Feature Details

    • 162 ft x 170 ft (27,540 sq ft)
    • Hot dip galvanized rigid steel frames
    • Flame-retardant fabric customized with tan, white and custom blue wave design
    • 36-inch overhangs with icebreakers and gutters in door locations
    • R-30 insulation with thermal break and 12 oz. fabric interior liner
    • 30 psf ground snow load, 90 mph wind speed, wind exposure C, seismic zone A
    • Legacy crews installed the building over an existing pool and structure and provided wrapped openings for doors, windows, HVAC and aquatic equipment
    Download Case Study

    Industry

    Sports & Recreation

    Size

    27,540 sq ft

    Location

    Chadron, NE

    Year

    2016

    Testimonials

    It's kind of like being outside all the time but still having shade.

    I love the amount of sunlight that you still get through the roof. It stays pretty warm in the winter and cooler in the summer. It͛s very quiet inside. When you get rain or hail or wind, there's no banging or clanging, no sharp or rough sounds. The acoustics are good. It's fresh and dry and clean. You don't ever have condensation dripping off the roof. It's a controlled environment, yet you still get the benefit of the daylight coming in.

    Joel Marr

    Legacy Building Solutions has given Solar Ship more than just a state-of-the-art hangar and assembly building.

    Through our close collaboration, their design incorporates a self-reliant photovoltaic power package that sits above the fabric roof, allowing our building operations to be entirely off-grid. In addition, Legacy’s foundation design allowed us to re-use an existing concrete pad, saving us time and money during construction. These innovations were part of our top-level requirements, and delivering on them really sets Legacy apart from the traditional building segment.

    Lewis Reford Solar Ship

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.