Projects

    SMM Scrap Metal Recycling

    placeholder-1140x400

    The Rundown

    To stay in line with air quality regulations in their area, a recycling company needed to enclose their current concrete containment bins. They partnered with Legacy to design, manufacture and install a structure that is able to house both storage and processing areas and is equipped with a building-supported conveyor and chemical fire suppression system.

    Feature Details

    • Building size: 74 ft x 150 ft with 87 ft x 125 ft lean-to (21,975 sq ft)
    • ExxoTec™ Elite PVC fabric cladding
    • 50 ft high offset peak to accommodate material pile brought in by building-supported conveying system
    • Fabric dividing wall separating product bin areas
    • Building columns designed for varying concrete wall heights for value engineering
    • Building supports chemical fire suppression system
    • Constructed on a pile-supported foundation due to poor soil conditions
    • Multiple large overhead doors installed for equipment access
    • 18.9 psf snow load, 115 mph wind load, wind exposure C, seismic C
    Download Case Study

    Industry

    State & Municipal

    Size

    21,975 sq ft

    Location

    Jersey City, NJ

    Year

    2018

    Testimonials

    Protecting this equipment helps it run more efficiently.

    We didn’t have any experience with fabric buildings, but they were a cost-effective solution for our needs. Protecting this equipment helps it run more efficiently. So far the building is doing the job of providing protection for the new equipment.

    Victor Cernius Regional Water Resource Agency

    The set up was ideal.

    With this Legacy design, we were able to save money and space by integrating a wash bay into the storage structure. The setup we use is also ideal for eliminating environmental concerns, since all the salt-laden water is contained instead of running off.

    Steve McAvoy INDOT

    It seemed to be the perfect solution.

    The building needed to be as salt resistant as possible. Legacy had a solid steel frame as opposed to tubular steel – it seemed to be the perfect solution.

    Mark Edelmann Bethel Park
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.