Projects

    Highland Farms Dressage Arena

    placeholder-1140x400

    The Rundown

    Building in the state of Oregon has a lot of pluses. Our crews are surrounded by beautiful scenery and, when they are done, our buildings really shine against the stunning wilderness backdrop.

    Feature Details

    • 72 ft x 140 ft (10,080 square feet)
    • Open walls on all four sides
    • HDG rigid steel frames
    • ExxoTec™ PVC fabric cladding on roof—white with tan trim
    • 13.5-foot sidewall clearance
    • 36-inch overhang extensions
    • ARV-2000 rooftop exhaust vents
    • 16 psf snow load, 100 mph wind speed, wind exposure C, seismic D
    • Building use: Dressage Arena
    Download Case Study

    Industry

    Equestrian

    Size

    10,080 sq ft

    Location

    Otis, OR

    Year

    2018

    Testimonials

    Legacy Building Solutions has given Solar Ship more than just a state-of-the-art hangar and assembly building.

    Through our close collaboration, their design incorporates a self-reliant photovoltaic power package that sits above the fabric roof, allowing our building operations to be entirely off-grid. In addition, Legacy’s foundation design allowed us to re-use an existing concrete pad, saving us time and money during construction. These innovations were part of our top-level requirements, and delivering on them really sets Legacy apart from the traditional building segment.

    Lewis Reford Solar Ship

    Their mission is customer service.

    My family owned and operated Kuka Equestrian Center LLC. From the get-go, Legacy Building Solutions has been absolutely wonderful to work with. Their mission is customer service. If you have any questions, you don't get the runaround and someone is on it right away, and they stay in communication with you. If you are in need of a building, look to Legacy Building Solutions and let them put together the perfect building for you.

    Mike Kuka

    The extended life span of a Legacy building over competitors was also a main factor.

    The finished interior was a key factor in ultimately choosing Legacy, as well as the simplicity of the solution and the relocatability. The extended life span of a Legacy building over competitors was also a main factor in choosing Legacy.

    Project Manager Camp Lemonnier
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.