Projects

    Friendship Equestrian Recover

    placeholder-1140x400

    The Rundown

    Friendship Equestrian Center (FEC), a boarding and training facility in upstate New York, has an 80 ft x 200 ft fabric riding arena used for year-round training, riding and dressage practice, originally installed in 2004. After a short time using the original building, the staff and customers at FEC noticed mildew growth along the walls and ceiling of the arena. As the mildew problem worsened over time and some microtears in the building started affecting the climate inside, staff knew it was time to replace the cover on the building.

    Feature Details

    • Hudson, New York
    • 80 ft x 200 ft Riding Arena
    • Recovered using ExxoTec™ fabric
    Download Case Study

    Industry

    Size

    16,000 sq ft

    Location

    Hudson, NY

    Year

    Testimonials

    Their mission is customer service.

    My family owned and operated Kuka Equestrian Center LLC. From the get-go, Legacy Building Solutions has been absolutely wonderful to work with. Their mission is customer service. If you have any questions, you don't get the runaround and someone is on it right away, and they stay in communication with you. If you are in need of a building, look to Legacy Building Solutions and let them put together the perfect building for you.

    Mike Kuka

    We had a great working relationship with Legacy

    A lot of the temporary structures in the region are fabric structures, so we mainly looked at those types of buildings. Due to the overall project timeline, the buildings had to be constructed in the dead of winter. We had a great working relationship with Legacy throughout the entire process. They supply a very high quality fabric structure, and we're certainly pleased with what we've seen from the buildings thus far.

    John Lehman BBE Hydro Constructors

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.