    The Rundown

    The biomethane production facility has a tall peak to allow tipping trucks inside, and a tightly sealed building envelope to contain odors. Clearspan floor space leaves plenty of room to store food waste for use.

    Feature Details

    • Building size: 120 ft x 160 ft with 25-ft sidewall clearance
    • Ventilation provided by doors and mesh vents
    • Frames and purlins will support equipment
    • All building steel, components and hardware are hot dip galvanized
    • Designed to carry an integrated fire suppression system
    • Sidewalls and framing built for future windows
    • Building use: Office and waste processing space

    Industry

    Oil Gas & Energy, Waste & Recycling

    Size

    19,200 sq ft

    Location

    Junction City, OR

    Year

    2011

    Testimonials

    The whole engineering phase with Legacy was excellent.

    They were very responsive to our ideas and turned things around very quickly. Even the installation was fast—the whole building was erected in about seven days. The fabric roof allows a lot of natural light into the building, which is a big advantage on the operations floor, since it reduces our need for artificial lighting inside. It provides significant sheltering from rain, wind and cold. Even though we didn't have it insulated, it's still noticeably more comfortable inside during the winter. The structure actually provides more of a shading and cooling effect. The Legacy building has performed at or above expectations in many ways. And on top of its functionality within our process, it offers environmentally friendly features in its own right. It's a great system for our application.

    Dean Foor JC Biomethane

    Working with Legacy was easy.

    This is definitely a more permanent building type. And working with Legacy was easy – there was good communication throughout the design and installation process.

    Joe Gianvito Fern Hollow

    The tripper works just as planned – which basically doesn’t ever happen.

    The building is working out better than we thought it would. The tripper is supported from the frame and works just as planned – which basically doesn’t ever happen.

    Greg Margeson Scrap Metal Recycling
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity

    Whatever your industry, project, and desired application, the Legacy team of engineers will make your vision a reality. Start your project with the team who will provide you more than the structural integrity of your building a partnership.