    The Rundown

    This 130 ft x 340 ft (44,200 sq ft) fabric structure, installed by Legacy Building Solutions, is engineered for strength and resilience in challenging environments. The hot-dip galvanized steel frame supports a tan fabric exterior with a white translucent peak for natural light. Designed for full exposure, it meets a 20 psf roof snow load, 90 mph windspeed, Exposure C, and Seismic Zone C requirements. Ventilation is provided through RV roof vents and mesh-covered 18-inch eave overhangs. The structure includes overhead coiling doors on each endwall, a cast-in-place foundation, and is reinforced to support a 375 lb/ft conveyor load.

    Feature Details

    • 130 ft x 340 ft (44,200 sq ft)
    • 20 psf roof snow load, 90 mph windspeed, expsoure C, seismic zone C, fully exposed
    • All frame components are hot-dip galvanized
    • Tan fabric with white translucent peak
    • Passive ventilation through RV roof vents and eave mesh on 18-in overhangs
    • Overhead coiling doors on each endwall
    • Cast-in-place foundation
    • Engineered for 375 lb/ft conveyor load
    • Installed by Legacy Building Solutions
    Download Project Profile

    Industry

    Bulk Commodity, Ports & Waterways

    Size

    44,200 sq ft

    Location

    Venice, IL

    Year

    2014

    Testimonials

    Legacy was very easy to work with.

    The old buildings used tubular steel, and no matter what you do, the salt gets inside the tubes and corrodes them. They came out here with their crew, rented all their equipment, and erected the buildings in three weeks flat – a week ahead of schedule. It's a stand-up company.

    Theo Gatsonis CM & Sons

    The Legacy construction crew was very professional and courteous.

    Because of our soil issues, we simply couldn't afford to construct a more traditional building. The concrete costs made a more traditional building cost prohibitive. The lightweight design of our Legacy building allowed us to reach a compromise between soil conditions and cost. Regarding the design and construction phases of the building, I can say that the process went exceptionally well. When I made eleventh-hour changes to the job, Legacy handled them with ease. They finished the job well ahead of schedule, worked safely, and followed our stringent safety requirements to the letter.

    Joe Bitter Alliant Energy/IEI Barge Services

    The new building will protect the salt supply.

    It will be protected from being compromised by wind and precipitation. Once the general contractor completed the footings and floors, Legacy installed the fabric building very quickly, in about two weeks. It was a very positive process with professional communication between Legacy and Dewberry throughout the project.

    Craig Swengle Dewberry Engineers
    Golden accent arrow

    Start Your Project

    Partnerships Equal Structural Integrity